The brew-shed required an upgrade to its power supply from 120 volts to 240 for the brewing setup. The “Golden Goddess” was powered with 120volts via an extension cord! A new line was run for both buildings. This required digging a trench trough rocks big and small then covering the PVC conduit with cement. Landscaping was the next job when electrical work was finished.